| S.No. | Procurement Type | Name of work | Date of Publication | Last Date of | Downloads |
|---|---|---|---|---|---|
| 1 |
Notice for Shortlisting of Consultants |
Development of Mobile Weather Application for Improved Weather Services (DHM/MFD/C/EOI/02-2082/83) |
2025-09-26 | 2025-10-05 | |
| 2 |
Notice for Shortlisting of Consultants |
Intensive Flow Measurement of stations of Bagmati, Kamala and Koshi Basin (DHM/HD/C/EOI/01A-2082/83) |
2025-09-26 | 2025-10-05 | |
| 3 |
Letter of Intent to Award. |
Supply and Delivery of Radar Spare Parts for the Maintenance of Surkhet Weather Radar Station (IBF No. BRCH/G/NCB/01-2082/83) |
2025-09-21 | 2025-09-27 | |
| 4 |
Letter of Intent to award the contract |
Security Service for DHM Office DHM/OTHERS/SQ/01-2082/83Security Service for DHM Office DHM/OTHERS/SQ/01-2082/83 |
2025-09-01 | 2025-09-07 | |
| 5 |
Notice for Shortlisting of Consultants |
Intensive Flow Measurement of stations of Bagmati, Kamala and Koshi Basin (DHM/HD/C/EOI/01-2082/83) |
2025-08-07 | 2025-08-14 | |
| 6 |
Intent to Award |
Supply, Delivery, Installation & Commissioning of ICT Equipment (Storage, Switches, etc.) |
2025-05-05 | 2025-05-11 | |
| 7 |
Letter of Intent |
Bathymetric,Topographic and GPR Survey of Glacial Lakes (DHM/HD/C/EOI/08-2081/82) |
2025-04-09 | 2025-04-16 | |
| 8 |
Letter of Intent |
Supply and Delivery of Meteorological Sensors and Spare Parts (DHM/MFD/G/NCB/07-2081/82) |
2025-04-09 | 2025-04-16 | |
| 9 |
Short-listing of Consultants |
ICT Support for Regular Operation of ICT Infrastructure in DHM (DHM/MFD/C/EOI/10-2081/82) |
2025-04-09 | 2025-04-16 | |
| 10 |
Letter of Intent to award the contract |
Preparation of Flood Hazard Map and Fixing Warning and Danger Level at Flood ForecastingStations (DHM/FFD/C/RFP/16-2081/82) |
2025-04-08 | 2025-04-14 | |
| 11 |
Letter of Intent to award the contract |
Consultancy Service for Water Quality Measurement Study (DHM/HD/C/RFP/11-2081/82) |
2025-04-07 | 2025-04-13 | |
| 12 |
Letter of Intent |
Integration of open source Hydrological forecasts in Common Web Portal (DHM/HD/C/RFP/10-2081/82) |
2025-03-30 | 2025-04-06 | |
| 13 |
Letter of Intent |
Supply and Delivery of Sediment Equipment. DHM/HD/G/NCB/05-2081/82) |
2025-03-26 | 2025-04-01 | |
| 14 |
Letter of Intent |
Intensive flow measurement of stations of Bagmati and Kamala Basin (DHM/HD/C/RFP/06-2081/82) |
2025-03-23 | 2025-03-30 | |
| 15 |
Letter of Intent |
Consulting of IT Service for the Regular Operation and Management of Aviation Meteorology Services (DHM/MFD/C/RFP/09- 2081/82) |
2025-03-23 | 2025-03-30 | |
| 16 |
Letter of Intent |
Consultancy Service for the Annual Maintenance of DHM Database (DHM/CD/C/RFP/01-2081/82) |
2025-03-21 | 2025-03-27 | |
| 17 |
Letter of Intent |
Inter-Comparison and Calibration of the Tipping Bucket Rain Gauges in Bagmati Province (DHM/MFD/C/RFP/07-2081/82) |
2025-03-16 | 2025-03-23 | |
| 18 |
Letter of Intent |
Update of climate change study for Nepal (DHM/CD/C/RFP/08-2081/82) |
2025-03-17 | 2025-03-23 | |
| 19 |
Letter of Intent to award the contract |
Construction and Maintenance Work in different Hydrological Stations of Bagmati Basin. (DHM/HD/W/NCB/02-2081/82) |
2025-03-11 | 2025-03-17 | |
| 20 |
प्रस्ताव स्वीकृत गर्ने आशयको सूचना । |
"Consultancy Services for Regular Monitoring, Maintenance and Field Verification (Calibration) of Automatic Weather Stations Installed at Domestic & International Airports for Providing Quality Aviation Weather Services" (DHM/BRCH/C/RFP/05-2081/82) |
2025-02-25 | 2025-03-03 | |
| 21 |
Letter of Intent to award the contract |
Maintenance Work for DHM Building (DHM/HD/W/NCB/01-2081/82)" |
2025-02-12 | 2025-02-18 | |
| 22 |
Letter of Intent to award the contract |
Supply and Delivery of Radiosonde Spare Parts (DHM/MFD/G/NCB/01-2081/82) |
2025-02-10 | 2025-02-16 | |
| 23 |
Notice for Shortlisting of Consultants |
Maintenance of Telemetry Equipment used for Flood Forecasting and Hosting Data on Website (DHM/FFD/C/EOI/07-2081/82) |
2025-02-05 | 2025-02-11 | |
| 24 |
Notice for Shortlisting of Consultants |
Preparation of Flood Hazard Map and Fixing Warning and Danger Level at Flood Forecasting Stations(DHM/FFD/C/EOI/09-2081/82) |
2025-02-03 | 2025-02-09 | |
| 25 |
Notice for Shortlisting of Consultants |
Consultancy service for Intensive Sediment Measurement (DHM/HD/C/EOI/03-2081/82) |
2025-01-23 | 2025-01-29 | |
| 26 |
Notice for Shortlisting of Consultants |
Bathymetric,Topographic and GPR Survey of Glacial Lakes_(DHM/HD/C/EOI/08-2081/83) |
2025-01-23 | 2025-01-29 | |
| 27 |
Notice for Shortlisting of Consultants |
Consulting Services for Maintenance Contract of Automatic Snow Stations for Operation and Data Posting (DHM/HD/C/EOI/05-2081/82) |
2025-01-21 | 2025-01-27 | |
| 28 |
Short-listing of Consultants |
Consultancy Service for Water Quality Measurement Study (DHM/FFD/C/EOI/02-2081/82) |
2025-01-21 | 2025-01-27 | |
| 29 |
Notice for Shortlisting of Consultants |
"Integration of open source Hydrological forecasts in Common Web Portal (DHM/HD/C/EOI/01-2081/82)” |
2025-01-21 | 2025-01-27 | |
| 30 |
Short-listing of Consultants |
Update of Climate Change Study for Nepal (DHM/CD/C/EOI/06-2081/82) |
2025-01-19 | 2025-01-26 | |
| 31 |
Short-listing of Consultants |
Consulting of IT Service for the Regular Operation and Management of Aviation Meteorology Services (DHM/MFD/C/EOI/04-2081/82) |
2025-01-19 | 2025-01-26 | |
| 32 |
Short Listing of EOI |
Strengthening the Community based Early Warning System (CbEWS) in Bagmati Flood Risk Communities in Rautahat and Sarlahi Districts |
2025-01-12 | 2025-01-12 | |
| 33 |
Shortlisting |
Supply, Delivery and Development of Synoptic Map Plotting and Analysis Tool (DHM/BRCH/C/EOI/01-2081/82) |
2024-12-31 | 2025-01-06 | |
| 34 |
Notice for Standing List 2081-82 |
Notice for Standing List 2081-82 |
2024-07-21 | 2024-08-21 | |
| 35 |
Consulting-EOI |
“Hardware and Software Maintenance, System Inspection and Maintenance Visit of Surkhet RADAR Station”, (BRCH/C/EOI/02-2080/81-Re) |
2024-06-06 | 2024-06-13 | |
| 36 |
Consulting |
Consulting Service for Rainfall induced landslide Study and Thresholds Determination (RFP No.: DHM/CD/C/RFP/17-2080/81) |
2024-05-22 | 2024-05-28 | |
| 37 |
Consulting |
Consulting Service for Rainfall induced Landslide study and Thresholds determination (DHM/MFD/C/RFP/17-2080/81) |
2024-04-21 | 2024-04-28 | |
| 38 |
Consulting |
Consulting Service for Weather/NWP Product Upgrade and Visualization for Website (DHM/MFD/C/RFP/12-2080/81) |
2024-04-02 | 2024-04-09 | |
| 39 |
Letter of Intent to award the contract |
Consulting Service for Intensive Flow Measurement and Cross Section Survey in Snow Stations (DHM/HD/C/RFP/14-2080/81) |
2024-03-31 | 2024-04-07 | |
| 40 |
Notice for Financial proposal opening |
Consulting Service for Intensive Flow Measurement and Cross Section Survey in Snow Stations (DHM/HD/C/RFP/14-2080/81)" |
2024-02-23 | 2024-03-01 | |
| 41 |
NCB |
Supply and Delivery of Manual Meteorological Instruments (IFB No: DHM/MFD/G/NCB/03-2080/81-Re) |
2024-02-22 | 2024-02-22 | |
| 42 |
Notification of Awards |
Supply, Delivery and Testing ofRLS, Data Logger, Communication System etc. for Flood Monitoring Stations (DHM/FFD/G/NCB/08-2080-81) |
2024-02-18 | 2024-02-25 | |
| 43 |
Notification of Awards |
Supply, Delivery, Installation andcommissioning of Video Conference System (DHM/FFD/G/SQ/03-2080/81) |
2024-02-18 | 2024-02-25 | |
| 44 |
Notice for Financial proposal opening |
Supply, Delivery and Installation and Commissioning of Weather Instruments with SoftwareDevelopment for Tourism Weather Forecasting (DHM/MFD/G/NCB/01-2080/81) |
2024-02-18 | 2024-02-26 | |
| 45 |
Consulting |
Implementation as Per Framework/Manual (Roadmap) for Quality Management System (QMS) (Contract ID:DHM/CD/C/RFP/01-2080/81) |
2024-02-02 | 2024-02-02 | |
| 46 |
NCB-Goods |
Supply and Deliveryof Manual Meteorological Instruments",(DHM/MFD/G/NCB/03-2080/81) |
2024-02-12 | 2024-02-12 | |
| 47 |
Letter of Intent to award the contract |
RLS, Data Logger, Communication System etc. for Flood Monitoring Stations (DHM/FFD/G/NCB/08-2080-81 |
2024-02-11 | 2024-02-18 | |
| 48 |
Notification of Awards |
Supply and Delivery of Meteorological Sensors and Spare parts” (DHM/MFD/G/NCB/06-2080/81) |
2024-02-11 | 2024-02-18 | |
| 49 |
Notification of Awards |
Supply, Delivery, Installation and Commissioning of Datacenter Security Solution, SAN Storage and Spare parts for ICT infrastructure (DHM/MFD/G/NCB/05-2080/81) |
2024-02-11 | 2024-02-11 | |
| 50 |
Letter of Intent to award the contract |
Meteorological Sensitivity Analysis and Product Development Framework for Rice Crop (DHM/C/RFP/07-2080/81) |
2024-02-02 | 2024-02-09 | |
| 51 |
Letter of Intent to award the contract |
Supply, Delivery, Installation and commissioning of Video Conference System (DHM/FFD/G/SQ/03-2080/81), " |
2024-02-11 | 2024-02-18 | |
| 52 |
Notice for Shortlisting of Consultants |
Consulting Service for Rainfall induced Landslide study and Thresolds determination (DHM/MFD/C/EOI/11-2080/81) |
2024-02-02 | 2024-02-09 | |
| 53 |
Letter of Intent to award the contract |
(Supply, Delivery, Installation and Commissioning of Datacenter Security Solution, SAN Storage and Spare parts for ICT infrastructure (DHM/MFD/G/NCB/05-2080/81) |
2024-02-02 | 2024-02-09 | |
| 54 |
Letter of Intent to award the contract |
Issuance of letter of intent to award the contract (Supply and Delivery of Meteorological Sensors and Spare parts” (DHM/MFD/G/NCB/06-2080/81) |
2024-02-02 | 2024-02-09 | |
| 55 |
Notice for Financial proposal opening |
Consultancy (ICT) services for regular maintenance AWS and data posting for hydro-meteorological disaster emergency warning (DHM/MFD/C/RFP/15-2080/81) |
2024-02-01 | 2024-02-08 | |
| 56 |
Notice for Financial proposal opening |
Supply and Delivery of Spare Parts for Surkhet Weather Radar (DHM/MFD/G/NCB/07-2080-81) |
2024-02-01 | 2024-02-08 | |
| 57 |
Notice for Financial proposal opening |
Supply and Delivery of Manual Meteorological Equipment (DHM/MFD/G/NCB/03-2080/81) |
2024-02-01 | 2024-02-08 | |
| 58 |
Notice for Financial proposal opening |
Consulting Services for Upgradation of Web-based Winhydro Application (Oracle-Based)” (DHM/HD/C/RFP/08-2080/81) |
2024-01-30 | 2024-02-06 | |
| 59 |
Notice for Financial proposal opening |
Operation, Upgradation and Management of DHM Website (DHM/FFD/C/RFP/11-2080/81)” |
2024-01-30 | 2024-01-30 | |
| 60 |
Notice for Shortlisting of Consultants |
Consulting Service for Hardware and Software maintenance, system inspection and calibration, Emergency maintenance visit of Surkhet RADAR (BRCH/C/EOI/01-2080/81-Re) |
2024-01-30 | 2024-02-06 | |
| 61 |
Works-NCB |
Improvement of DHM Building including Civil, Interior and Parking (DHM/W/SQ/02-2080/81) |
2024-01-30 | 2024-02-06 | |
| 62 |
Letter of Intent to award the contract |
Improvement of DHM Building including Civil, Interior and Parking (DHM/W/SQ/02-2080/81) |
2024-01-22 | 2024-01-29 | |
| 63 |
Letter of Intent to award the contract |
Update of climate change study for Nepal (DHM/CD/C/RFP/04- 2080/81) |
2024-01-22 | 2024-01-29 | |
| 64 |
NCB-Goods |
Supply and Delivery of Radiosonde Spare Parts (IFB No: DHM/MFD/G/NCB/02-2080/81) |
2024-01-21 | 2024-01-21 | |
| 65 |
Goods-NCB |
Supply, Delivery, Installation and Commissioning of Automatic Weather Stations in Bagmati” Province (DHM/CD/G/NCB/04-2080/81) |
2024-01-11 | 2024-01-24 | |
| 66 |
Consulting |
Consulting Service for Impact Based Forecast Piloting, (DHM/MFD/C/RFP/03-2080/81) |
2024-01-03 | 2024-01-09 | |
| 67 |
NCB |
Supply, Delivery, Installation and Commissioning of Automatic Weather Stations in Bagmati” Province (DHM/CD/G/NCB/04-2080/81) |
2023-12-29 | 2023-12-29 | |
| 68 |
Consulting-EOI |
Consulting Service for Weather/NWP Product Upgrade and Visualization for Website (DHM/MFD/C/RFP/12-2080/81) |
2023-12-24 | 2023-12-24 | |
| 69 |
Notice for Shortlisting of Consultants |
Consultancy (ICT) services for regular maintenance AWS and data posting for hydro-meteorological disaster emergency warning (DHM/MFD/C/EOI/09-2080/81) |
2023-12-21 | 2023-12-27 | |
| 70 |
NCB |
Supply and Delivery of Radiosonde Spare Parts (IFB No: DHM/MFD/G/NCB/02-2080/81) |
2023-12-21 | 2023-12-28 | |
| 71 |
Consulting-EOI |
Maintenance of Telemetry Equipment used for Flood Forecasting and Hosting Data on Website |
2023-12-20 | 2023-12-20 | |
| 72 |
Notice for Shortlisting of Consultants |
"Consulting Service for Intensive Flow Measurement and Cross Section Survey in Snow Stations (DHM/HD/C/EOI/07-2080/81) |
2023-12-19 | 2023-12-20 | |
| 73 |
NCB |
Supply, Delivery and Installation and Commissioning of Weather Instruments with Software Development for Tourism Weather Forecasting” (DHM/MFD/G/NCB/01-2080/81) |
2023-12-01 | 2023-12-08 | |
| 74 |
Sealed Quotation |
Supply, Delivery, Installation, provisioning and Commissioning of Internet and Intranet (DHM/MFD/G/SQ/01-2080/81) |
2023-11-17 | 2023-11-17 | |
| 75 |
Works-NCB |
Invitation for Bids No.: DHM/OHM-BHW/W/NCB/01-2080/81 |
2023-10-20 | 2023-11-20 | |
| 76 |
Goods-NCB |
Financial Proposal Opening Notice for “Supply, Delivery and Installation and Commissioning of Weather Instruments with Software Development for Tourism WeatherForecasting” (DHM/MFD/G/NCB/01-2080/81) |
2023-10-20 | 2023-10-27 | |
| 77 |
Goods-NCB |
Notification of Award IFB No.: DHM/HD/G/NCB/12-2079/80 |
2023-10-16 | 2023-10-26 | |
| 78 |
Notice for Financial proposal opening |
Discharge Measurement and Cross Section Works at Bagmati Basin Stations” (DHM/HD/C/RFP/01-2080/81) |
2023-10-13 | 2023-10-20 | |
| 79 |
Consulting-EOI |
Consultancy Service for the Annual Maintenance of DHM Database” (DHM/CD/C/EOI/05-2080/81) |
2023-10-02 | 2023-10-02 | |
| 80 |
Consulting-EOI |
Meteorological Sensitivity Analysis and Product Development Framework for Rice Crop” (DHM/CD/C/EOI/06-2080/81) |
2023-10-02 | 2023-10-02 | |
| 81 |
NCB |
Supply, Delivery, Installation and Commissioning of Snow Stations (DHM/HD/G/NCB/12-2079/80) |
2023-09-26 | 2023-09-26 | |
| 82 |
Consulting |
Consultancy Services for “Update of climate change study for Nepal” (EOI: DHM/CD/C/EOI-04/2080/81) |
2023-09-25 | 2023-10-01 | |
| 83 |
Consulting RFP |
Request for Submission of Proposal for “Consulting Services for Utilization and Product generation training of RADAR Data for the extreme weather forecasting /nowcasting Study and Research” (DHM/MFD/C/RFP-02/2080/81) |
2023-09-19 | 2023-10-19 | |
| 84 |
Consulting RFP |
Request for Submission of Proposal for "Implementation as Per Framework/Manual (Roadmap) for Quality Management System (QMS) of Aviation Meteorological Services” (DHM/MFD/C/RFP/01-2080/81) |
2023-09-19 | 2023-10-19 | |
| 85 |
Consulting-EOI |
Consulting Service for Impact Based Forecast Piloting (EOI: DHM/MFD/C/EOI-01/2080/81)” |
2023-09-14 | 2023-09-21 | |
| 86 |
Consulting |
Consulting Services for Utilization and Product generation training of RADAR Data for the extreme weather forecasting / nowcasting Study and Research (IFB No: DHM/MFD/C/EOI/03-2080/81) |
2023-09-13 | 2023-09-13 | |
| 87 |
Consulting |
Implementation as Per Framework/Manual (Roadmap) |
2023-09-13 | 2023-09-13 | |
| 88 |
Letter of Intent to award the contract |
Water Quality Measurement Study |
2023-07-12 | 2023-07-19 | |
| 89 |
Letter of Intent to award the contract |
Supply and Delivery of Double Cabin Pickup (PRBFRMP/PIU/Vehicle/EQ-04) |
2023-06-20 | 2023-06-26 | |
| 90 |
Letter of Intent to award the contract |
Supply and Delivery of Double Cabin Pickup (PRBFRMP/PIU/Vehicle/EQ-04(B)) |
2023-06-13 | 2023-06-19 | |
| 91 |
Letter of Intent to award the contract |
Supply, Delivery and Installation of Electronic Goods(DHM/GBIAAS/G/NCB/02-2079/80) |
2023-05-22 | 2023-05-29 | |
| 92 |
Notification of Awards |
“Upgradation and maintenance of hydrological stations of Bagmati basin” (IFB No.: DHM/HD/W/NCB/ 04-2079/80) |
2023-05-03 | 2023-05-17 | |
| 93 |
Rejection of Proposal |
“Supply, Delivery, Installation and Commissioning of Snow Stations” (IFB No.: DHM/HD/G/NCB/12-2079/80) |
2023-04-26 | 2023-05-01 | |
| 94 |
Notice for Financial proposal opening |
Notice for financial proposal opening
|
2023-04-26 | 2023-05-02 | |
| 95 |
Letter of Intent to award the contract |
“Upgradation and maintenance of hydrological stations of Bagmati basin” (IFB No.: DHM/HD/W/NCB/04-2079/80) |
2023-04-26 | 2023-05-02 | |
| 96 |
Notification of Awards |
“Supply, Delivery, Installation and Commissioning of Advanced Maintenance Platform for Meteorological Sensors/Equipment Maintenance and Tests” (IFB No.: DHM/MFD/G/NCB/06-2079/80) |
2023-04-20 | 2023-05-04 | |
| 97 |
Notification of Awards |
“Supply, Delivery, and Installation of Remote-Controlled Automatic Bank Operated Cableway System” (IFB No.: DHM/HD/G/NCB/05-2079/80) |
2023-04-18 | 2023-05-01 | |
| 98 |
Letter of Intent to award the contract |
“Supply, Delivery, Installation and Commissioning of Advanced Maintenance Platform for Meteorological Sensors/Equipment Maintenance and Tests” (IFB No.: DHM/MFD/G/NCB/06-2079/80) |
2023-04-07 | 2023-04-13 | |
| 99 |
Letter of Intent to award the contract |
“Supply, Delivery, and Installation of Remote-Controlled Automatic Bank Operated Cableway System” (IFB No.: DHM/MFD/G/NCB/05-2079/80) |
2023-04-07 | 2023-04-13 | |
| 100 |
Goods-NCB |
“Supply, Delivery, Installation and Commissioning of Snow Stations” (DHM/HD/G/NCB/12-2079/80) |
2023-03-23 | 2023-04-02 | |
| 101 |
Notice for Financial proposal opening |
“Supply,Delivery, Installation and Comissioning of Extension of High Power Computer(HPC) for Numerical Weather Prediction) (IFB No: DHM/PPCR/G/NCB/10-2079/80) |
2023-03-02 | 2023-03-07 | |
| 102 |
Rejection of Proposal |
“Consultancy Services for Maintenance Contract of Automatic Weather Station (Station Maintenance, Regular Monitoring and Data Posting) (DHM/MFD/C/RFP/05-2079/80))” |
2023-02-27 | 2023-03-04 | |
| 103 |
Rejection of Proposal |
“Consultancy Services for Maintenance, Support and Upgradation of ICT Infrastructure, Database and Website, Management of DHM, (RFP No.: DHM/PPCR/C/RFP/06-2079/80)” |
2023-02-27 | 2023-03-05 | |
| 104 |
Notice for Shortlisting of Consultants |
“Water Quality Measurement Study” (EOI: DHM/HD/C/EOI-05/2079/80) |
2023-02-27 | 2023-03-04 | |
| 105 |
Letter of Intent to award the contract |
“Software Development for automation of climate data analysis and product visualization” (RFP No.: DHM/CD/C/RFP/03-2079/80)” |
2023-02-26 | 2023-03-04 | |
| 106 |
Notification of Awards |
“Supply and delivery of Water Quality Laboratory Instruments and Chemicals” (IFB No.: DHM/HD/SQ/01-2079/80) |
2023-02-23 | 2023-03-02 | |
| 107 |
Notification of Awards |
“Upgrading of Radar access Road , and Improvement of office building including Radar Tower support Infrastructure at Chitre danda Rautamai-1 , Udayapur” (IFB No.: DHM/W/NCB/02-2079/80) |
2023-02-23 | 2023-03-09 | |
| 108 |
Notification of Awards |
“Improvement of DHM Building including Civil, Interior and Parking” (DHM/W/NCB/01-2079/80) |
2023-02-23 | 2023-03-09 | |
| 109 |
Letter of Intent to award the Contract |
"Supply and delivery of Water Quality Laboratory Instruments and Chemicals” (DHM/HD/SQ/01-2079/80) |
2023-02-14 | 2023-02-20 | |
| 110 |
Notification of Award |
Upgrading of Radar access Road, and Improvement of office building including Radar Tower support Infrastructure at Chitre danda Rautamai-1, Udayapur” (IFB No.:DHM/W/NCB/02-2079/80) |
2023-02-14 | 2023-02-21 | |
| 111 |
Notification of Award |
Improvement of DHM Building including Civil, Interior and Parking (DHM/W/NCB/01-2079/80) |
2023-02-14 | 2023-02-21 | |
| 112 |
Notification of Award |
“Supply and Delivery of Meteorological Spare Parts” (IFB No.: DHM/MFD/G/NCB/04-2079/80) |
2023-01-30 | 2023-02-12 | |
| 113 |
Notification of Award |
“Supply and Delivery of Meteorological Sensors” (IFB No.: DHM/MFD/G/NCB/03-2079/80) |
2023-01-29 | 2023-02-12 | |
| 114 |
Notification of Award |
“Supply, Delivery and Installation of Thermometer with Digital Display" (IFB No.: DHM/MFD/G/NCB/02-2079/80) |
2023-01-30 | 2023-02-12 | |
| 115 |
Notification of Award |
“Supply and Delivery of Digital Barometer (IFB No.: DHM/MFD/G/NCB/01-2079/80) |
2023-01-30 | 2023-02-12 | |
| 116 |
Goods-NCB |
“Supply and Delivery of Digital Barometer (IFB No.: DHM/MFD/G/NCB/01-2079/80) |
2023-01-23 | 2023-01-29 | |
| 117 |
Goods-NCB |
“Supply and Delivery of Meteorological Spare Parts” (IFB No.: DHM/MFD/G/NCB/04-2079/80) |
2023-01-23 | 2023-01-29 | |
| 118 |
Goods-NCB |
“Supply and Delivery of Meteorological Sensors” (IFB No.: DHM/MFD/G/NCB/03-2079/80) |
2023-01-23 | 2023-01-29 | |
| 119 |
Goods-NCB |
“Supply, Delivery and Installation of Thermometer sensors with Digital Display” (DHM/MFD/G/NCB/02-2079/80) |
2023-01-23 | 2023-01-29 | |
| 120 |
Notice for financial Proposal Opening |
“Supply and Delivery of Digital Barometer (DHM/MFD/G/NCB/01-2079/80) |
2023-01-04 | 2023-01-10 | |
| 121 |
Notice for financial Proposal Opening |
“Supply, Delivery and Installation of Thermometer with Digital Display” (DHM/MFD/G/NCB/02-2079/80) |
2023-01-04 | 2023-01-10 | |
| 122 |
Notice for financial Proposal Opening |
“Supply and Delivery of Meteorological Sensors” (IFB No.: DHM/MFD/G/NCB/03-2079/80) |
2023-01-04 | 2023-01-10 | |
| 123 |
Notice for financial Proposal Opening |
“Supply and Delivery of Meteorological Spare Parts” (IFB No.: DHM/MFD/G/NCB/04-2079/80) |
2023-01-04 | 2023-01-10 | |
| 124 |
Notification for Intention to Award the Contract |
“Discharge Measurement and Cross Section Works at Bagmati Basin Stations” (DHM/HD/C/RFP/02-2079/80) |
2022-12-13 | 2022-12-19 | |
| 125 |
Addendum |
“Supply and Delivery of Meteorological Sensors” (IFB No.: DHM/MFD/G/NCB/03-2079/80) |
2022-12-06 | 2022-12-16 | |
| 126 |
Shortlisting of Consultants |
“Software Development for automation of climate data analysis and product visualization” (EOI: DHM/CD/C/EOI-02/2079/80) |
2022-12-06 | 2022-12-12 | |
| 127 |
Notification for Intention to Award the Contract |
Flood Forecasting and Early Warning System for Karnali and Narayani River Basin in Nepal (Contract No.: DHM/C/RFP/ICB/01-2078/79) |
2022-08-23 | 2022-08-29 | |
| 128 |
Hydrological Data Publication |
तथ्यांक प्रकाशन |
2022-08-09 | 2022-08-09 | |
| 129 |
Shortlisting of Consultants |
“DEVELOP SEDIMENT MONITORING GUIDELINES AND PLAN FOR RIVER BASINS OF NEPAL (DHM/C/EOI/01-2078/79) |
2022-07-11 | 2022-07-17 | |
| 130 |
Notice for approval of sealed quotation |
Approved |
2022-03-31 | 2022-03-31 | |
| 131 |
Test |
2021-01-04 | 2021-01-04 | ||
| 132 |
DHM |
2020-07-01 | 2020-07-13 |